Training track · as of 2026-11

Regulators, Auditors and Test Lab Staff

Regulator technical and supervision staff, external and internal auditors, test lab engineers, policy advisers

You will be able to read an operator's architecture and evidence pack, ask for the record that proves a control works, and see what a proposed rule would do to the systems that must follow it.

Regulators, Auditors and Test Lab Staff training track · https://thebackendofluck.com/training/tracks/regulators-and-auditors.html · as of 2026-11

Download PDF (416 KB) Português
Duration
19.3 h of core lessons + 220 min of fixed region lessons + 120 min of extension lessons + 45 min of session openings: 25.7 h in all
Slides
316 in lessons + 74 fixed region + 15 extension: 405-405 in all
Format
Nine remote sessions (never more than 3.5 hours of contact each), or five days on site; two blocks of two and a half days also work. Lectures, case studies, workshops and three labs in the review variant; no code. About 6 hours of post-work for the closing task. Record the lectures first for this track if any are recorded.
Prerequisites
Two years in regulation, audit, testing or policy. No coding.
Outcome
A sampling plan for an operator evidence pack and a control-to-record checklist.
Regions
No choice: a fixed regime comparison block across four regions.
Assessment
Closing quiz (20 questions). Three review labs under the 75 percent rule. Closing task: a sampling plan and a control-to-record checklist.
Certificate
Attendance record only. Hours count toward the full program.
  1. Stage 1 · Session 1

    Foundations

  2. Stage 2 · Sessions 1-2

    How the platform works

  3. Stage 3 · Sessions 2-3

    Game integrity

  4. Stage 4 · Sessions 3-5

    Player-facing controls

  5. Stage 5 · Sessions 5-7

    Data, evidence and incidents

  6. Stage 6 · Sessions 7-9

    Fixed region lessons

  7. Stage 7 · Session 9

    Track extension lessons

    1. Teams get an operator's evidence index for one quarter and plan a sample: which controls, how many records, which period, what would count as a finding. A second sample period shows how the first plan holds up. The debrief compares sampling plans. Not built yet; estimate 60 min, 4 slides (whiteboard design).

      In the book: Ch 25 GLI-GSF Compliance Framework Ch 25b Regulatory Reporting and Evidence Export

      Link to this step

    2. The same control written three ways: as an outcome (Ontario), as a technical standard (GLI-19 style) and as a prescriptive rule with a named system (a national registry or a data feed). It shows what each does to architecture, cost and auditability. Not built yet; estimate 20 min, 8 slides (lecture).

      In the book: Ch 02 Regulation and Compliance Landscape Ch 06 Licensing Guide Ch 25 GLI-GSF Compliance Framework

      Link to this step

    3. Teams take one draft technical rule and estimate what it would cost an operator to build, run and prove: systems touched, evidence produced, release speed lost. The debrief compares the estimates and asks which wording would cut the cost without weakening the control. Not built yet; estimate 40 min, 3 slides (whiteboard design).

      In the book: Ch 02 Regulation and Compliance Landscape Ch 06 Licensing Guide Ch 25b Regulatory Reporting and Evidence Export

      Link to this step

Common pitfalls

  • Asking for a document when the control leaves a log. The document describes intent; the log shows what happened.
  • Writing a rule that names a technology, which ages faster than the rule.
  • Treating a lab certificate as proof about production when change control has not been examined.
  • Sampling only the period the operator prepared for.
  • Reading this track as the operator's view of what regulators should want. It describes how systems work, and the regime's goals stay with the regulator.

Sources

  1. UNLV International Center for Gaming Regulation, executive educationunlv.edu
  2. AGCO, Registrar's Standards for Internet Gaming (full text)agco.ca
  3. UK Gambling Commission, testing strategy for remote gambling and software technical standards, summarygamblingcommission.gov.uk
  4. GLI University traininggaminglabs.com
  5. Brazil, Medida Provisória 1.394 of 25 September 2026 (Planalto)planalto.gov.br
  6. Brazil, SPA/MF regulatory agenda 2026-2027gov.br
  7. UK Gambling Commission, AML guidance for casinos, Part 4.5 Traininggamblingcommission.gov.uk

Hours, slide counts and lesson numbers follow the training plan and can change after a dry run. Check the training page for the current plan.

This roadmap is also available in Portuguese.Ler em português